35 breakdowns in the last 3 months. This concerns the approximately 9-kilometer-long steel water main leading from the Araratyan 1/2 pumping station to the Kharberd Daily Regulating Reservoirs (DRR), which supplies water to the town of Masis and the communities of Ayntap, Nor Kyurin, Arevabuyr, Marmarashen, and Jrahovit—serving a total of 9,500 subscribers. For years, this steel water main has been one of the most problematic sections of the network. Built in 2000, the pipeline passes through marshy terrain, causing the pipes to corrode and deteriorate over time. During every repair, the company was forced to halt the operation of the pumping station and announce water outages across the six settlements, naturally causing justified dissatisfaction among consumers.
Shortly after a repair was completed, the worn-out pipe would rupture again in another section. To resolve the issue fundamentally, Veolia Djur CJSC has launched the reconstruction of the most emergency-prone 2,250-linear-meter section of the water main using a new 426 mm steel pipeline. This is the largest project ever implemented on this water main. To date, 950 linear meters of the new pipeline have already been constructed. Favorable weather conditions permitting, the works are scheduled to be fully completed in January, permanently resolving the issue of frequent breakdowns and the resulting water supply interruptions.